Energy Use Modeling

EnergyPlus

The energy use data embedded in the Impact Building Calculator is modeled with the physics-based EnergyPlus whole building energy simulation engine supplemented by a machine learning algorithm. Simulations were performed using the Existing Commercial Reference Buildings Constructed In or After 1980 (v1.4) provided by the United States Department of Energy. Simulations were performed for every possible combination of ECCMs available in the Building Decarbonization Calculator within each Building Segment, across all representative climate zones.

Results of these simulations were normalized by unit gross floor area. When asset data is entered in the Calculator, the area-normalized data is scaled to the user input.

End Use

In the context of energy consumption, "end use" refers to the specific category or application where energy is utilized within a building or system. End use breaks down total energy use into individual functions, such as heating, cooling, lighting, or equipment operation. Understanding end uses helps identify where energy is consumed most and informs targeted energy efficiency measures for each category.

Characteristics of Prototype Models

The following is a summary of the characteristics of the prototype models used in the analysis. Where available prototype models were used rather than custom created, the full model documentation and the models themselves are available from the US Department of Energy Office of Energy Efficiency and Renewable Energy.

Use CategoryConditioned GFAWindow-to-Wall Ratio
Hospital (built before 2000)564,400 sf16%
Hospital (built after 2000)241,410 sf16%
Hotel (small)43,200 sf11%
Hotel (large)122,132 sf30%
Office (small)5,500 sf21%
Office (medium)53,600 sf33%
Office (large)498,600 sf40%
Supermarket45,006 sf7%
Urban Grocery*5,000 sf15%
Storefront Retail3,200 sf15%
Warehouse52,000 sf1%
Refrigerated Warehouse*215,200 sf1%
Quick Service Restaurant2,500 sf14%
Mixed Use Super Tall Building*821,791 sf58%
Dormitory*40,000 sf30%

* The urban grocery, refrigerated warehouse, mixed-use super tall building, and dormitory prototype models were created for this tool only and are not DoE-supplied models.

Typical Baseline Systems

USA & AUS & CAN

Use CategoryBaseline HVAC Systems
HospitalHot water system with gas boilers; Chilled water system with water-cooled chillers and open cooling tower; Floor-by-floor VAV AHUs with hot water reheat and steam humidifiers; Central service water heaters - gas-fired
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or Packaged rooftop air conditioner with two fan speed (Size dependent); Warm air furnace, electric
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired
Office (small)Packaged rooftop heat pump with gas auxiliary heat
Office (medium)Packaged air conditioning unit with gas-fired heating; Distribution via Variable Air Volume (VAV) terminals with electric reheat; Service water heaters - gas-fired
Office (large)Hot water system with a gas boiler; Chilled water system with water-cooled chillers and open cooling tower; Fluid coolers for data centers; Distribution via VAV terminals with hot water reheat; Service water heaters - gas-fired
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired furnaces; Service water heaters - gas-fired
Urban GroceryPackaged central unit, pPackaged rooftop units (RTUs), Centralized water heater - gas-fired
Storefront RetailPackaged RTUs equipped with an electric DX coil for cooling and gas furnace for heating, Gas water heaters
WarehousePackaged single-zone RTUs, Instantaneous electric water heater
Refrigerated WarehousePackaged RTUs for office and loading, Instantaneous electric water heater, Central cooling system with screw compressors and evaporator units for cooler/freezer storage areas
Quick Service RestaurantPackaged single-zone RTUs, Natural gas water heater
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers, Floor-by-floor VAV AHUs for office, retail,
and hotel common spaces. DOAS supplying OA to each AHU, Fan coil + DOAS for hotel guest rooms, Natural gas water heaters (multi-zone distribution)
DormitoryFan coil units with a makeup air unit and district cooling and heating, Centralized natural gas-fired boiler system

EU & UK

Use CategoryBaseline HVAC Systems
HospitalFan coil units with gas boilers and water-cooled chillers; Dedicated Outside Air System (DOAS) with hydronic heating and cooling coils
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or Packaged rooftop air conditioner with two fan speed (Size dependent); Warm air furnace, electric
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired
Office (small)Packaged rooftop heat pump with gas auxiliary heat
Office (mediumPackaged air conditioning unit with gas-fired heating; Distribution via Variable Air Volume (VAV) terminals with electric reheat; Service water heaters - gas-fired
Office (large)Hot water system with a gas boiler; Chilled water system with water-cooled chillers and open cooling tower; Fluid coolers for data centers; Distribution via VAV terminals with hot water reheat; Service water heaters - gas-fired
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired furnaces; Service water heaters - gas-fired; Air-to-air heat recovery in all Northern European locations
Urban GroceryPackaged central unit, pPackaged rooftop units (RTUs), Centralized water heater - gas-fired
Storefront RetailPackaged RTUs equipped with an electric DX coil for cooling and gas furnace for heating, Gas water heaters
WarehousePackaged single-zone RTUs, Instantaneous electric water heater
Refrigerated WarehousePackaged RTUs for office and loading, Instantaneous electric water heater, Central cooling system with screw compressors and evaporator units for cooler/freezer storage areas
Quick Service RestaurantPackaged single-zone RTUs, Natural gas water heater
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers, Floor-by-floor VAV AHUs for office, retail,
and hotel common spaces. DOAS supplying OA to each AHU, Fan coil + DOAS for hotel guest rooms, Natural gas water heaters (multi-zone distribution)
DormitoryFan coil units with a makeup air unit and district cooling and heating, Centralized natural gas-fired boiler system

Singapore and Hong Kong

Use CategoryBaseline HVAC Systems
HospitalFan coil units with hydronic coils served by water-cooled chillers; Dedicated Outside Air System (DOAS) with hydronic heating and cooling coils; Demand Control Ventilation was assumed when built after 2000; No airside heat/energy recovery
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or Packaged rooftop air conditioner with two fan speed (Size dependent); Warm air furnace, electric; No airside heat/energy recovery
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired; No airside heat/energy recovery
Office (small)Packaged rooftop heat pump with gas auxiliary heat
Office (medium)Packaged air conditioning unit with gas-fired heating; Distribution via Variable Air Volume (VAV) terminals with electric reheat; Service water heaters - gas-fired; No Demand Control Ventilation when built after 2000
Office (large)Hot water system with a gas boiler; Chilled water system with water-cooled chillers and open cooling tower; Fluid coolers for data centers; Distribution via VAV terminals with hot water reheat; Service water heaters - gas-fired; No Demand Control Ventilation when built after 2000; Energy recovery wheels on all air handling units
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired furnaces; Service water heaters - gas-fired
Urban GroceryPackaged central unit, pPackaged rooftop units (RTUs), Centralized water heater - gas-fired
Storefront RetailPackaged RTUs equipped with an electric DX coil for cooling and gas furnace for heating, Gas water heaters
WarehousePackaged single-zone RTUs, Instantaneous electric water heater
Refrigerated WarehousePackaged RTUs for office and loading, Instantaneous electric water heater, Central cooling system with screw compressors and evaporator units for cooler/freezer storage areas
Quick Service RestaurantPackaged single-zone RTUs, Natural gas water heater
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers, Floor-by-floor VAV AHUs for office, retail,
and hotel common spaces. DOAS supplying OA to each AHU, Fan coil + DOAS for hotel guest rooms, Natural gas water heaters (multi-zone distribution)
DormitoryFan coil units with a makeup air unit and district cooling and heating, Centralized natural gas-fired boiler system

UAE

Use CategoryBaseline HVAC Systems
HospitalHot water system with gas boilers; Air-cooled chillers when built before 2000, and district cooling system when built after 2000; Floor-by-floor VAV AHUs with hot water reheat and steam humidifiers; Central service water heaters - gas-fired; No energy recovery
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or Packaged rooftop air conditioner with two fan speed (Size dependent); Warm air furnace, electric; No energy recovery
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired; No energy recovery
Office (small)Packaged rooftop heat pump with gas auxiliary heat; No energy recovery
Office (medium)Packaged air conditioning unit with gas-fired heating; Distribution via Variable Air Volume (VAV) terminals with electric reheat; Service water heaters - gas-fired
Office (large)Hot water system with a gas boiler; water-cooled chillers when built before 2000, and air-cooled chillers when built after 2000; Fluid coolers for data centers; Single-zone packaged split air conditioners when built before 2000, and distribution via Variable Air Volume (VAV) terminals with electric reheat when built after 2000; Service water heaters - gas-fired; No energy recovery
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired furnaces; Service water heaters - gas-fired; No energy recovery
Urban GroceryPackaged central unit, pPackaged rooftop units (RTUs), Centralized water heater - gas-fired
Storefront RetailPackaged RTUs equipped with an electric DX coil for cooling and gas furnace for heating, Gas water heaters
WarehousePackaged single-zone RTUs, Instantaneous electric water heater
Refrigerated WarehousePackaged RTUs for office and loading, Instantaneous electric water heater, Central cooling system with screw compressors and evaporator units for cooler/freezer storage areas
Quick Service RestaurantPackaged single-zone RTUs, Natural gas water heater
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers, Floor-by-floor VAV AHUs for office, retail,
and hotel common spaces. DOAS supplying OA to each AHU, Fan coil + DOAS for hotel guest rooms, Natural gas water heaters (multi-zone distribution)
DormitoryFan coil units with a makeup air unit and district cooling and heating, Centralized natural gas-fired boiler system

Saudi Arabia

Use CategoryBaseline HVAC Systems
HospitalHot water system with gas boilers; Chilled water system with air-cooled chillers and open cooling tower; Floor-by-floor VAV AHUs with hot water reheat and steam humidifiers; Central service water heaters - gas-fired; No energy recovery
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or Packaged rooftop air conditioner with two fan speed (Size dependent); Warm air furnace, electric; No energy recovery
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired; No energy recovery
Office (small)Packaged rooftop heat pump with gas auxiliary heat; No energy recovery
Office (medium)Packaged air conditioning unit with gas-fired heating; Distribution via Variable Air Volume (VAV) terminals with electric reheat; Service water heaters - gas-fired; No energy recovery
Office (large)Hot water system with a gas boiler; water-cooled chillers when built before 2000, and air-cooled chillers when built after 2000; Fluid coolers for data centers; Single-zone packaged split air conditioners when built before 2000, and distribution via Variable Air Volume (VAV) terminals with electric reheat when built after 2000; Service water heaters - gas-fired; No energy recovery
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired furnaces; Service water heaters - gas-fired; No energy recovery
Urban GroceryPackaged central unit, pPackaged rooftop units (RTUs), Centralized water heater - gas-fired
Storefront RetailPackaged RTUs equipped with an electric DX coil for cooling and gas furnace for heating, Gas water heaters
WarehousePackaged single-zone RTUs, Instantaneous electric water heater
Refrigerated WarehousePackaged RTUs for office and loading, Instantaneous electric water heater, Central cooling system with screw compressors and evaporator units for cooler/freezer storage areas
Quick Service RestaurantPackaged single-zone RTUs, Natural gas water heater
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers, Floor-by-floor VAV AHUs for office, retail,
and hotel common spaces. DOAS supplying OA to each AHU, Fan coil + DOAS for hotel guest rooms, Natural gas water heaters (multi-zone distribution)
DormitoryFan coil units with a makeup air unit and district cooling and heating, Centralized natural gas-fired boiler system

Argentina & Chile

Use CategoryBaseline HVAC Systems
HospitalHot water system with gas boilers; Chilled water system with water-cooled chillers and open cooling tower; Floor-by-floor VAV AHUs with hot water reheat and steam humidifiers; Central service water heaters - gas-fired
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or packaged rooftop air conditioner with two fan speed; Warm air furnace, electric
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired
Office (small)Packaged rooftop heat pump with gas auxiliary heat
Office (medium)Packaged air conditioning unit with gas-fired heating; Distribution via VAV terminals with electric reheat; Service water heaters - gas-fired
Office (large)Hot water system with gas boiler; Chilled water system with water-cooled chillers and open cooling tower; Fluid coolers for data centers; Distribution via VAV terminals with hot water reheat; Service water heaters - gas-fired
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired furnaces; Service water heaters - gas-fired
Urban GroceryPackaged central unit; Packaged rooftop units (RTUs); Centralized water heater
Storefront RetailPackaged rooftop units (RTUs), equipped with electric DX coil for cooling and fossil fuel furnace for heating
WarehousePackaged single-zone rooftop units (RTUs); Instantaneous electric water heater
Refrigerated WarehousePackaged rooftop units (RTUs) serving office spaces and loading areas; Instantaneous electric water heater; Central cooling system with screw compressors and evaporator units for cooler/freezer storage
Quick Service RestaurantPackaged single-zone rooftop units (RTUs); Natural gas water heater
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers; Floor-by-floor VAV AHUs for office, retail, and hotel common spaces; DOAS supplying OA to each AHU; Fan coil + DOAS for hotel guest rooms; Natural gas water heaters (electric per modifications)
DormitoryFan coil units with makeup air unit and district cooling and heating; Centralized natural gas-fired boiler system

Brazil

Use CategoryBaseline HVAC Systems
HospitalHot water system with gas boilers; Chilled water system with water-cooled chillers and open cooling tower; Floor-by-floor VAV AHUs with hot water reheat and steam humidifiers; Central service water heaters - gas-fired
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or packaged rooftop air conditioner with two fan speed; Warm air furnace, electric; No wall insulation in zones 0-1
Hotel (large)Hot water system with gas boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Central service water heaters - gas-fired; No wall insulation in zones 0-1
Office (small)Packaged rooftop heat pump with gas auxiliary heat; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Office (medium)Packaged air conditioning unit with gas-fired heating; Distribution via VAV terminals with electric reheat; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Office (large)Hot water system with gas boiler; Chilled water system with water-cooled chillers and open cooling tower; Fluid coolers for data centers; Distribution via VAV terminals with hot water reheat; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
SupermarketPackaged single-zone rooftop units with DX cooling and gas-fired
furnaces; Service water heaters - gas-fired
Urban GroceryPackaged central unit; Packaged rooftop units (RTUs); Electric water heaters; No wall insulation in zones 0-1
Storefront RetailPackaged rooftop units (RTUs), equipped with electric DX coil for cooling and fossil fuel furnace for heating; Electric water heaters; Heating coils always off in zones 0-1
WarehousePackaged single-zone rooftop units (RTUs); Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Refrigerated WarehousePackaged rooftop units (RTUs) serving office spaces and loading areas; Electric water heaters; Central cooling system with screw compressors and evaporator units for cooler/freezer storage; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Quick Service RestaurantPackaged single-zone rooftop units (RTUs); Electric water heaters; Heating coils always off in zones 0-1
Mixed Use Super Tall BuildingCentralized hydronic plant with natural gas boilers and water-cooled chillers; Floor-by-floor VAV AHUs for office, retail, and hotel common spaces; DOAS supplying OA to each AHU; Fan coil + DOAS for hotel guest rooms; Electric water heaters; Heating coils always off in zones 0-1
DormitoryFan coil units with makeup air unit and district cooling and heating; Centralized natural gas-fired boiler system; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1

India

Use CategoryBaseline HVAC Systems
HospitalHot water system with gas boilers; Chilled water system with water-cooled chillers and open cooling tower; Floor-by-floor VAV AHUs with hot water reheat and steam humidifiers; Electric water heaters; Energy recovery; Heating coils always off in zones 0-1
Hotel (small)Packages terminal air conditioner with electric heating; Packaged rooftop air conditioner or packaged rooftop air conditioner with two fan speed; Warm air furnace, electric; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Hotel (large)Hot water system with electric boilers; Chilled water system with air-cooled chillers; Guest rooms: four-pipe fan coils; Public spaces: VAV with hot water reheat; Electric water heaters; Energy recovery; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Office (small)Packaged rooftop heat pump with gas auxiliary heat; No SHW energy; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Office (medium)Packaged air conditioning unit with electric heating; Distribution via VAV terminals with electric reheat; No SHW energy; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Office (large)Hot water system with electric boiler; Chilled water system with water-cooled chillers and open cooling tower; Fluid coolers for data centers; Distribution via VAV terminals with hot water reheat; Electric water heaters; Energy recovery; Heating coils always off in zones 0-1
SupermarketPackaged single-zone rooftop units with DX cooling and electric furnaces; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Urban GroceryPackaged central unit; Packaged rooftop units (RTUs); Electric water heaters; No wall insulation in zones 0-1
Storefront RetailPackaged rooftop units (RTUs), equipped with electric DX coil for cooling and electric furnace for heating; No SHW energy; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
WarehousePackaged single-zone rooftop units (RTUs); Instantaneous electric water heater; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Refrigerated WarehousePackaged rooftop units (RTUs) serving office spaces and loading areas; Instantaneous electric water heater; Central cooling system with screw compressors and evaporator units for cooler/freezer storage; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Quick Service RestaurantPackaged single-zone rooftop units (RTUs); No SHW energy; Heating coils always off in zones 0-1; No wall insulation in zones 0-1
Mixed Use Super Tall BuildingCentralized hydronic plant with electric boilers and water-cooled chillers; Floor-by-floor VAV AHUs for office, retail, and hotel common spaces; DOAS supplying OA to each AHU; Fan coil + DOAS for hotel guest rooms; Electric water heaters; Heating coils always off in zones 0-1
DormitorySplit heat pumps/ACs; Electric water heaters; Heating coils always off in zones 0-1; No wall insulation in zones 0-1

Representative Locations and Climate Zones

To fill in the location-specific climate data required for analysis, the Impact Building Calculator pairs a user's selected location with a representative location that is complete with ASHRAE climate zone data. Matching between selected and representative locations is completed using the following order of operations:

  • First: the Calculator looks for the geographically closest representative city with the same climate zone. This matching type is considered a "Good match".
  • Second: when there are no matching climate zones in proximity, the Calculator looks for a similar climate zones in the selected country. If multiple exist, the asset is matched with the similar representative location that is geographically-closest. This matching type is considered a "Decent Match".
  • Third: when there are no similar climate zones in proximity, the Calculator will indicate the selected city is a poor match for the Calculator.

The following is the list of the representative cities for each ASHRAE Climate Zone modeled in the Calculator. More data on the ASHRAE Climate Zones is available online (pdf).

USA & AUS & CAN

Australia

  • 2A – Brisbane
  • 3A – Sydney
  • 3B – Adelaide

Canada

  • 4C – Vancouver
  • 5A – Toronto
  • 6A – Montreal
  • 7 – Calgary

USA

  • 1A – Miami, FL
  • 1B – Phoenix, AZ
  • 2A – Houston and Dallas, TX; Jacksonville and Orlando, FL
  • 2B – Tucson, AZ; Las Vegas, NV
  • 3A – Atlanta, GA; Memphis and Nashville, TN; Raleigh, NC
  • 3B – El Paso, TX; Las Vegas, NV
  • 3C – Los Angeles and San Francisco, CA
  • 4A – Baltimore, MD; Nashville, TN; Louisville, KY; Wichita, KS; New York City, NY; Philadelphia, PA; Washington, DC
  • 4B – Albuquerque, NM
  • 4C – Seattle, WA; Portland, OR
  • 5A – Chicago, IL; Boston, MA; Omaha, NE; Des Moines, IA
  • 5B – Boulder, CO; Boise, ID; Salt Lake City, UT
  • 5C – Bremerton, WA
  • 6A – Minneapolis, MN; Burlington, VT
  • 6B – Helena, MT
  • 7 – Duluth, MN

EU & UK

Belgium

  • 4A – Brussels

Denmark

  • 5A – Copenhagen

France

  • 3A – Bordeaux
  • 4A – Paris
  • 5A – Belfort

Finland

  • 6A – Helsinki

Germany

  • 4A – Frankfurt
  • 5A – Berlin

Italy

  • 3A – Rome
  • 3B – Cozzo Spadaro
  • 4A – Milano

Norway

  • 6A – Oslo

Poland

  • 5A – Warsaw

Portugal

  • 3A – Lisbon

Spain

  • 3A – Barcelona

Sweden

  • 7 – Kiruna

United Kingdom

  • 4A – London
  • 5A – Birmingham

Singapore

  • 0A – Singapore, Singapore

UAE

  • 0B – Dubai

Saudi Arabia

  • 1B – Bisha
  • 2B – Taif

South America

Argentina

  • 2A – San Miguel de Tucuman
  • 2B – Santiago del Estero
  • 3A – Buenos Aires
  • 3B – Mendoza
  • 4B – La Quiaca
  • 4C – Comodoro Rivadavia
  • 5B – Río Gallegos
  • 5C – Bariloche
  • 6A – Ushuaia

Brazil

  • 0A – Salvador
  • 0B – Petrolina
  • 1A – Rio de Janeiro
  • 2A – São Paulo

Chile

  • 2A – Isla de Pascua
  • 3B – Santiago
  • 3C – Concepción
  • 4A – Puerto Montt
  • 4C – Temuco
  • 6A – Punta Arenas

India

  • 0A – Mumbai
  • 0B – Ahmedabad
  • 1A – Hyderabad
  • 1B – New Delhi
  • 2A – Dehradun
  • 2B – Amritsar
  • 4A – Srinagar

Hong Kong

  • 2A – Hong Kong

Building Vintages

Assets in the tool have either one or two building vintages to choose from, namely, those built or renovated before 2004, 2005-2009, and 2010-2015. The following table describes how the vintages were constructed.

RegionVintage LabelPNNL Prototype LabelHVAC Modifications
EU & UKPre-2004PNNL 1980-2004 **+ relevant HVAC modifications. See Typical Baseline Systems for HVAC systems per use type.
EU & UK2004-2009PNNL 2010 *2004-2009 vintage in EU is assumed to be on par with 2010 PNNL prototype *+ relevant HVAC modifications. See Typical Baseline Systems for HVAC systems per use type.
USA & AUS & CANPre-2004PNNL 1980-2004
USA & AUS & CAN2004-2009PNNL 2004
Singapore, UAE, and Saudi Arabia2004-2009PNNL 2004**+ relevant HVAC modifications. See Typical Baseline Systems for HVAC systems per use type.
Singapore, UAE, and Saudi Arabia2010-2015PNNL 2010**+ relevant HVAC modifications. See Typical Baseline Systems for HVAC systems per use type.

Column Header Key:

  • Region: the country in which the asset is located.
  • Vintage Label: the asset's year of original construction or last major renovation
  • PNNL Prototype Label: prototype building models developed by the Pacific Northwest National Laboratory (PNNL) have been utilized as typical examples of existing buildings for all typologies.
  • HVAC Modifications: notes on variances from the PNNL prototype building models.